Client: – Hacking & Patterson Ltd
Site: – Milverton Road, Giffnock
Date: – July, 2015
Scope: – Resurface access road in car park
Solution: – The residents of 19-21 Milverton Road, Giffnock required resurfacing work done on their access road and in the communal car park for the 26 flats. Woking closely with the Chair of the Residents Committee the works were carried out in an orderly fashion to minimise the disruption to the residents. The existing defective surface was planed off and reinstated with Stone Mastic Asphalt Wearing Course. The entrance was re-leveled to stop the flow of water from the street coming into the car park and creating flooding. Thermoplastic paint was then applied to form car parking spaces.